LiveWest Bristol Foyer
Case Study
In February 2023, Evo Fire & Security was presented with a high-profile project by LiveWest. Their mission: to design, install, and commission a state-of-the-art Paxton access control system at Bristol Foyer, a vital housing facility for vulnerable young people in the heart of Bristol. This marked Evo's first large-scale undertaking for LiveWest, solidifying its growing reputation in the security industry.
The project involved installing the advanced Paxton Net 2 access control system, complete with a front-end PC, across 82 doors within the occupied building. A considerable challenge was the need to maintain a high degree of project management and rigid adherence to a strict program of work. The facility was at full capacity, making the stakes of each operation crucial to the security and well-being of its residents.
Evo's task involved transitioning from traditional keylocks to access control on all bedroom doors, a significant operational shift that required detailed and meticulous planning. The team ensured that no bedroom was left unsecured at the end of each shift, exemplifying their commitment to both safety and precision.
The unique environment of the facility posed its own challenges, but the Evo team faced them head-on. Combining expert knowledge of security systems, a patient and careful approach to project management, and a deep respect for the residents' circumstances, they were able to navigate these obstacles with professionalism.
Thanks to their rigorous planning, adaptability, and dedication to the task at hand, Evo not only successfully completed the upgrade but did so ahead of schedule. This accomplishment further cemented their reputation for quality, reliability, and efficient service. It showcased the company's commitment to ensuring security for those most vulnerable, proving Evo to be a trusted partner in the fire and security industry.
I am pleased to say that Evo Fire & Security have carried out a superb job on site at Bristol Foyer. As building manager, I was concerned and genuinely worried about this upgrade project, due to our building being oversubscribed and always at full capacity, I wasn't sure how such a large project could be carried out without down time and effecting both staff and residents. From the initial pre-start meeting Evo provided us with confidence, this evolved throughout the project and due to efforts of the installers and management at Evo, the project was a complete success from start to finish. We had a couple of issues and design changes throughout, which were dealt with efficiently and effectively by the Evo team. I am pleased to have Evo on board as an approved contractor and look forward to working with them in the future.
Richard Williams
Team Manager
LiveWest